The Tsunami is a closed loop water cooled system and requires no utility water services. Do not
place the chiller above the laser. Should the unit not be installed properly, and a leak develops,
dripping w a t e r may damage one or both lasers. The hoses are 3.6 M (12ft) long. Connect the
Chiller output first to the Millennia, from the Millennia to the Tsunami then back to the chiller.
You may have the newer model Millennia eV that comes with cooling hoses that splits in parallel to
cool both components.

Power Requirements

Type
Voltage
Current
Footnote:
1 – With optional Lok-To-Clock configuration.
2 – With earth ground.

Power connections

Before connecting the power supply to the AC power line, make sure that all the power supply
power switches are OFF.
SPECTRA-PHYSICS' SERVICE ENGINEERS CANNOT PERFORM
ELECTRICAL OR PLUMBING WORK AT YOUR SITE.
Final Check:
Upon the completion of the installation of utilities, verify that the services meet
all building safety codes.
©Newport Corporation
Electrical
1
3955/3930
3955/3930
2
Single Phase
Single phase
110 VAC
220 VAC
<1A
MKS Spectra-Physics Confidential
1
Chiller
2
2
Single phase
110 / 220 VAC
<0.5A
10A
6 of 10

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Spectra-Physics Tsunami and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents