Pre-Installation Guide
for
Ascend
Spectra-Physics, Inc.
3635 Peterson Way
Santa Clara, CA 95054
May 2020
©Newport Corporation
MKS Spectra-Physics Confidential
1 of 12

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Spectra-Physics Ascend and is the answer not in the manual?

Questions and answers

Summary of Contents for MKS Spectra-Physics Ascend

  • Page 1 Pre-Installation Guide Ascend Spectra-Physics, Inc. 3635 Peterson Way Santa Clara, CA 95054 May 2020 ©Newport Corporation MKS Spectra-Physics Confidential 1 of 12...
  • Page 2: Table Of Contents

    Cleaning the Output Window _______________________________________________________ 10 Pre-Installation Considerations (Continued) _______________________________________ 11 Power Supply Air Filter Replacement _________________________________________________ 11 Coolant Maintenance ______________________________________________________________ 11 Pre-Installation Considerations (Continued) _______________________________________ 12 Chiller Fluid ______________________________________________________________________ 12 General Procedures ________________________________________________________________ 12 ©Newport Corporation MKS Spectra-Physics Confidential 2 of 12...
  • Page 3: Introduction

    We at Spectra-Physics intend to provide you with responsive support so that you can derive great satisfaction and value in using our systems for your applications. We are available to you at 1- 800-456-2552. ©Newport Corporation MKS Spectra-Physics Confidential 3 of 12...
  • Page 4: Pre-Installation Checklist

    Each system comes with a manual; verify that you have received this item. Please report any missing or damaged items to Spectra-Physics, or you may contact your Spectra- Physics’ Sales Engineer. ©Newport Corporation MKS Spectra-Physics Confidential 4 of 12...
  • Page 5: When The System Arrives (Continued)

    Before the arrival of your Spectra-Physics Service Engineer please review the following pre- installation requirements. When all the requirements have been met, initial the boxes and fax a signed copy to the Spectra-Physics Service department at (408) 980-6921. ©Newport Corporation MKS Spectra-Physics Confidential 5 of 12...
  • Page 6: Pre-Installation Considerations

    System Components The Ascend laser system is comprised of four basic components: 1. Ascend laser head 2. Model APS-160 power supply 3. Ascend control software installed on a system computer 4. Refrigerated Chiller ©Newport Corporation MKS Spectra-Physics Confidential 6 of 12...
  • Page 7: Pre-Installation Considerations (Continued)

    Power supply to laser head signal cable 109” (2.8 meters) Power supply to laser head power cable 109” (2.8 meters) 2x TNC 50Ω, RF cables 109” (2.8 meters) 2x Coolant Hoses 117” (3 meters) with quick connect fittings ©Newport Corporation MKS Spectra-Physics Confidential 7 of 12...
  • Page 8: Pre-Installation Considerations (Continued)

    Pre-Installation Considerations (Continued) Outline Drawings Figure 14. Laser head Beauty Cover outline drawing ©Newport Corporation MKS Spectra-Physics Confidential 8 of 12...
  • Page 9: Pre-Installation Considerations (Continued)

    The Ascend laser system was designed for minimal maintenance. Follow the routine procedures described in this chapter to keep the system in good working condition for the life of the laser. For further information, contact your Spectra-Physics service representative. ©Newport Corporation MKS Spectra-Physics Confidential 9 of 12...
  • Page 10: Pre-Installation Considerations (Continued)

    Spectra-Physics service representative for additional window cleaning techniques, if needed. Do not remove the optical cavity cover or the window seal for any reason, or you will void your warranty and may damage your laser. ©Newport Corporation MKS Spectra-Physics Confidential 10 of 12...
  • Page 11: Pre-Installation Considerations (Continued)

    *NOTE: to restrict the growth of algae in the reservoir, it is recommended that the reservoir cover be kept in place and that all circulation lines be opaque. This will eliminate the entrance of light that is required for the growth of most common algae. ©Newport Corporation MKS Spectra-Physics Confidential 11 of 12...
  • Page 12: Pre-Installation Considerations (Continued)

    If any of the output characteristics have changed, please call Spectra-Physics Technical Support at 1-800-456-2552. Customer Signature Date Phone Number Fax Number E-Mail Sales Order Number ©Newport Corporation MKS Spectra-Physics Confidential 12 of 12...