MKS Spectra-Physics InSight X3 Pre-Installation Manual

MKS Spectra-Physics InSight X3 Pre-Installation Manual

Hide thumbs Also See for Spectra-Physics InSight X3:

Advertisement

Quick Links

Pre-Installation Guide
®
for InSight
X3
and DS
System
Spectra-Physics, Inc.
3635 Peterson Way
Santa Clara, CA 95054
April 2020
©Newport Corporation
MKS Spectra-Physics Confidential
1 of 11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Spectra-Physics InSight X3 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for MKS Spectra-Physics InSight X3

  • Page 1 Pre-Installation Guide ® for InSight ™ and DS ™ System Spectra-Physics, Inc. 3635 Peterson Way Santa Clara, CA 95054 April 2020 ©Newport Corporation MKS Spectra-Physics Confidential 1 of 11...
  • Page 2: Table Of Contents

    ..................................9 ILTERS MAINTENANCE AGREEMENT (CONTINUED) ....................10 ............................... 10 ENERAL ROCEDURES :............................. 10 EQUIRED AINTENANCE ..........................10 ASER MEASUREMENT EQUIPMENT MAINTENANCE AGREEMENT (CONTINUED) ....................11 ................................11 CCESSORY ............................11 REVENTATIVE AINTENANCE ©Newport Corporation MKS Spectra-Physics Confidential 2 of 11...
  • Page 3: Introduction

    We at Spectra-Physics intend to provide you with responsive support so that you can derive great satisfaction and value in using our systems for your applications. We are available to you at 1- 800-456-2552 or service@spectra-physics.com for Technical Support. ©Newport Corporation MKS Spectra-Physics Confidential 3 of 11...
  • Page 4: When The System Arrives

    During installation, power measurements will be demonstrated on all the standard wavelengths. Your Customer Service Engineer can identify any other specifications that will be demonstrated and the equipment necessary to conduct the tests. A non-standard system will require special consideration. ©Newport Corporation MKS Spectra-Physics Confidential 4 of 11...
  • Page 5: Pre-Installation Considerations

    F. Please note that the laser head is very heavy and requires a sturdy and stable optical table. Consider room requirements for future maintenance and upgrades by your Spectra-Physics’ Field Service Engineer. ©Newport Corporation MKS Spectra-Physics Confidential 5 of 11...
  • Page 6: Physical Description

    The chiller must always be on when the power supply is on, even if the diode lasers are not on. Power Requirements Electrical Type IPS300 Single Phase (SP# IPS300) Voltage 100-120VAC, 50/60 Hz 200-240 VAC, 50/60 Hz Current Chiller Voltage 120-240 VAC, 50/60 Hz ≤ 15A Current ©Newport Corporation MKS Spectra-Physics Confidential 6 of 11...
  • Page 7: Heat Load

    • a mouse or other Windows®-compatible pointing device • a video display with 1024 x 768 (SVGA) or higher resolution • an available USB port. • Microsoft Windows XP® or Windows 7® operating system ©Newport Corporation MKS Spectra-Physics Confidential 7 of 11...
  • Page 8: Pre-Installation Checklist

    Obtain the correct safety glasses and a power meter.  Read the User’s Manual, especially sections entitled “Receiving and Inspecting”, and “Installation” Customer Signature Date Phone Number Fax Number E-Mail Sales Order Number ©Newport Corporation MKS Spectra-Physics Confidential 8 of 11...
  • Page 9: Maintenance Agreement

    The purge unit in the IPS-300 power supply is not user serviceable. Please contact your Spectra-Physics service representative to schedule a visit to replace the unit. ©Newport Corporation MKS Spectra-Physics Confidential 9 of 11...
  • Page 10: Maintenance Agreement (Continued)

    Interface and sensor. BeamTrack series 10A-PPS laser measurement sensor is adequate to measure the optical power.  The StarLab application together with an Ophir meter turns your PC or laptop into a full-fledged laser power/ energy meter. ©Newport Corporation MKS Spectra-Physics Confidential 10 of 11...
  • Page 11: Maintenance Agreement (Continued)

    Verify that the chiller is set to the appropriate temperature, and good coolant level. Reference the User’s manual that came with your system. It is recommended you read the entire manual before operating the laser system. ©Newport Corporation MKS Spectra-Physics Confidential 11 of 11...

This manual is also suitable for:

Spectra-physics insight ds

Table of Contents