Isobus Installation - Yetter GERMINATE UNIFORMITY 2940 Operator's Manual

Air adjust residue manager
Table of Contents

Advertisement

ISOBUS Installation – To Tractor Hitch Connector
Step 1:
Install 2940-655 Yetter ISOBUS Y Harness at Yetter Control Box. Install triangular 3 pin connector on the 2940-655 to triangular 3
pin connector on the 2940-654 Yetter Control Harness.
Step 2:
Install 2940-657 (15ft) or 2940-658 (30ft) extension harnesses to 2940-655 & route to ISOBUS connector on hitch of the tractor.
Step 3:
Install 2940-656 ISOBUS Hitch Harness to 2940-657 or 2940-658 at tractor hitch. Plug other end of 2940-656 into tractors
ISOBUS port on hitch.
Step 1:
Install the 2940-655 Yetter ISOBUS Y Harness at the Yetter Control Box. Install the triangular 3 pin connector on the
2940-655 to the triangular 3 pin connector on the 2940-654 Yetter Control Harness.
Step 2:
Remove the JD rear terminating resister harness from the planter. Install the 2940-659 JD ISOBUS Adapter Harness.
Step 3:
Install the 2940-657 (15ft) or 2940-658 (30ft) extension harnesses between the 2940-655 & 2940-659.
ISOBUS Installation – Ag Leader (RCM I)
Step 1:
Remove terminating resister at Planter Control Module of Ag Leader system, install 2940-662 Ag Leader Adaptor harness in its place.
Step 2:
Install 2940-658 (30ft) extension harnesses between the 2940-662 & 2940-658. (2 pin connector not used, apply tape to seal off)
Step 3:
Install 2940-661 at the Yetter Control Box. Install 3 pin triangular connectors together, 6 pin Deutsch connectors install together, &
the terminating resister removed in (Step 1) installs to remaining open connector.
ISOBUS Installation – John Deere
27

Advertisement

Table of Contents
loading

Table of Contents