Preparation; Before First Operation - Dräger Vapor 19.n Instructions For Use Manual

Table of Contents

Advertisement

Preparation

Before first operation

Preparation
Before first operation
The connection systems (e.g. plug-in adaptor and perma-
nent connection of Vapor to anaesthetic machine) must
only be installed by trained service personnel.
Use only authentic Dräger parts for installation.
1 Two screws (M 4 x 30) of at least class 8.8
(ISO 4762) strength.
If screws of different lengths are used – for connec-
ting a piece of different thickness – these must be of
at least class 8.8 (ISO 4762) strength.
Two serrated locking washers, (A 4.3 DIN 6798)
2 Two sealing rings, order no. M 21929
Tighten screws by applying a torque of 2.7 to 3.0 Nm.
Check that Vapor is connected correctly so that the
fresh gas flows through the vaporiser as shown.
If the direction of flow is reversed the concentration
delivered will not be correct.
For ISO-cone and conical hose connections:
Check that the male cone is connected to the Vapor
inlet because the flow through the Vapor would be in
the wrong direction otherwise.
For coded plug-in adaptors:
Check that the correct plug-in adaptor for the anaes-
thetic agent concerned has been fitted.
For a description of plug-in adaptors and their coding,
see page 29.
If plug-in adaptors with wrong codes are used the
display on the monitor of the anaesthetic machine will
not be correct.
Check that the Vapor is not damaged.
Filling Vapor, see page 9.
Checking concentration, see page 24.
8
‫.ﻣراﺟﻌﮫ ﻓرﻣﺎﯾﯾد‬WWW.ELM-FAN.IR‫ﺑرای داﻧﻠود ﻣوارد ﺑﯾﺷﺗر ﺑﮫ ﺳﺎﯾت‬
To download more items, go to ELM-FAN.IR
2
Outlet
Ausgang
1
Inlet
Eingang

Advertisement

Table of Contents
loading

Table of Contents