Install Bulkhead Fittings - Graco HydroShield 26D030 Manual

Auto conversion kit
Table of Contents

Advertisement

Upper DIN Rail
C11
C13
C12
Lower DIN Rail
F
. 1 DIN rail components
IG
Lower DIN Rail Components
Install the pressure switches from left to right on the
lower DIN rail. Match the orientation of the existing
pressure switch with the air connection pointing down.
See F
. 1.
IG
1. Install the PTI pressure switch (D) next to the
existing pressure switch.
2. Install the ERI pressure switch (E) next to PTI
pressure switch (D).
Manifold Components
Remove the plug, and install the EEO solenoid (F) and
the EEO solenoid air fitting (FF) in the lower most
location of the manifold. See F
3A8812B
B
A
C14
D
E
. 2.
IG
FF
F
. 2 Manifold components
IG

Install Bulkhead Fittings

Remove hole plugs as needed, and install bulkhead
fittings inside the isolation cabinet.
Electronics Control Panel Bulkhead Fittings
1. Install two bulkhead fittings to the bottom of the
electronics control panel in the following order (see
F
. 4):
IG
-
PTI bulkhead fitting (G)
-
ERI bulkhead fitting (H)
2. Apply labels (15) on top of the existing port labels
as shown in F
. 3.
IG
G
H
F
. 3 Control panel labels
IG
Installation
E
F
5

Advertisement

Table of Contents
loading

Table of Contents