Peg Survey; Overview - Leica FlexLine Manual

Mining application
Hide thumbs Also See for FlexLine:
Table of Contents

Advertisement

2
2.1
Description

Peg Survey

Peg Survey

Overview

The application Peg Survey is used:
to establish a forward peg (point).
to control the intermediate horizontal angle between backsight and foresight
points.
to check the horizontal distances and heights of the backsight and foresight
points.
to compute the coordinates of the foresight point.
Users can measure several sets in different sequences. The quality of measurement
is controlled by the tolerances which are set before starting Peg Survey.
P0
P1
h2+
h1-
Hz2
d1
Hz1
TSOX_Mining_001
P0
P2
P1
h1-
P2
h1
d2
h2
d1
d2
HZ1 Horizontal direction to backsight
HZ2 Horizontal direction to foresight point
Station
Backsight point
Foresight point
Height of the reflector
Height of the instrument
Distance to backsight point
Distance to foresight point
point
FlexLine/FlexLine plus, 9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Flexline plus

Table of Contents