Running in the excavator
During the first 50 hours of operation, the following points should be adhered to in all cases:
Warm up the excavator at an average engine speed and with a low load; do not let it warm up at idling position.
Do not overload the excavator.
Pre-operational services
For the performance of the services, the excavator must be parked on level ground and the key must
be removed. Also, the control levers and the swivel frame have to be locked (page 29, page 30).
Open the engine hood (page 112). After completing the work, close the engine compartment cover and se-
cure it with a padlock.
68
Operation
W9215-8135-1
06/2021