CM_P - Manual humidity calibration

1) Switch unit ON
2) On operator PCB set DIP switch 2 to „ON" position
3) Select calibration with timer dial:
4) Activate manual calibration by pressing core temperature key
5) To de-activate function test set DIP switch 2 to „OFF"
position. Switch unit off and on again.
Duration for calibration is 45 min for unit size 61-102 and 60 min for unit size 201-202.
This basic information is evaluated during „self test" after installation or during manual calibration and stored on
the PCB and EEPROM.
Manual calibration has to be done when any of the below listed service work has been carried out:
1
changing PCB
2
removing of fan wheel / motor
3
changing thermocouple B4
4
changing differential pressure sensor P1
5
changing air baffle
6
installation of a UltraVent or extraction hood on top of the unit
7
installation as the lower unit of a Combi Duo after it has done a self test as a single unit
Note: In this case do NOT run a new self test, as otherwise the boiling point and the gas blower speed
will be overwritten!
V08 en, SCC
manual calibration
- 86 -
X20
X19
X18
A4
1,6AT
X21
X23
X14
X13
X11
X 8
X7
X9
X26
X27
X25
X30
X12
CR 2032
Dip 1
X 1
Dip 2
X50
X 2
X 4
X10
X 5
X 6
Ethernet
X 3
option
X31
X24
X17 X16
X32

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents