EDAN SE-12 Series User Manual page 74

Electrocardiograph
Hide thumbs Also See for SE-12 Series:
Table of Contents

Advertisement

SE-12 Series Electrocardiograph User Manual
4. Connect the power cords, and connect the earth wire (when necessary)
5. Load the recorder paper
6. Turn on the stress BP monitor and treadmill/ergometer
7. Set the electrocardiograph
1) Activate the stress ECG function.
For details, please contact the manufacturer or the local distributor.
2) After turning on the electrocardiograph, press Pretest on the keyboard to open the main
screen of the exercise test.
3) Select Setup on the main screen1 to open the System Setup screen.
4) Configure the System Setup screen.
For details, please refer to Chapter 10 "System Setup".
8. Set the treadmill or the ergometer for external control
1) For TM-400 treadmill
It is ready for external control and needn't be set.
2) For Lode Treadmill Valiant
Hold down the following two keys for 10 seconds, and then you will enter the service
menu of the Valiant.
By default, the Valiant is shipped with the Lode RS232 communication protocol. It
should be set to the Trackmaster RS232 protocol. You can change the communication
protocol by following the procedures below:
a) Select Prot id and select the second RS232 protocol which is the Trackmaster
communication protocol
b) Select Baudrate and set this to 4800 Baud
c) Press the red button to leave the service menu
d) Turn off the Valiant
3) For Lode ergometer
By default, the Corival ergometer is shipped with the LODE RS232 communication
protocol. It should be set to the ERGOLINE P4 protocol. You can change the RS232
protocol by following the procedures below:
a) Turn on the ergometer and press Enter
b) You will be in MAINMENU
Operation Instructions for Exercise ECG
- 68 -

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se-12Se-12 expressSe-1200Se-1200 expressSe-1201

Table of Contents