Start-up
6.2
Installation
For comfortable installation you can pull the cable
through the cable inlets after having removed the break-
out openings.
To install the DHC Basic IO Box, proceed as follows:
Unscrew both lower screws of the cover (B) with an
1.
appropriate screwdriver and remove it (see figure 2+3).
Warning!
Disconnect from mains before removing the cover!
2.
Connect the phase conductor to connecting terminal
L (C).
3.
Connect the neutral conductor to connecting terminal
N (D).
4.
Connect the protective conductor to connecting termi-
nal PE (E).
Connect e.g. the boiler to connecting terminal 1 (F) or
5.
a circulation pump to the connecting terminals of the
switching channel 2 (G).
6.
Push the latches of the cover into the openings provid-
ed and fasten the screws to close the cover.