Installing The Ridge - Deeplas ENVIROTILE Installation Manual

Table of Contents

Advertisement

22. INSTALLING THE RIDGE

22
INSTALLING THE RIDGE MOULDINGS
Main ridge cap moulding
Starting at the right hand side loose fit the ridge to apex cover moulding over the hip to ridge apex. Then loose fit the ridge cap
moulding over the ventilated ridge roll and then interlock with the next ridge cap.
Cut length (L)
Main ridge cap moulding
cut to suit ridge length
Lay out and interlock the main ridge sections
together loosely along the full length of the
roof. When correctly aligned permanently
fix into place using the bedded batten as
a fixture point for the 90mm screw fixings
required to permanently fix two ridge
sections together. Start the mechanical screw
fixing procedure from the right hand side of
the roof using the fixing hole (R) on the apex
at each end.
Then cut the left hand ridge cap moulding
to length.
At an abutment wall cut the ridge cap
moulding so there is a 2-3mm gap between
the flashing and the cut edge of the cap.
Fit and secure.
When fixing cut ridge caps drill a hole to
allow for 2 fixings as per full ridge caps.
3 6
|
E N V I R O T I L E
Main ridge cap moulding
I N S T A L L A T I O N
Main ridge cap moulding
G U I D E
Ridge to apex cover moulding
If the cut length (L) is less than
half the length of the ridge cap
moulding it is recommended
that you cut two ridge cap
mouldings and space accordingly.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ENVIROTILE and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Related Products for Deeplas ENVIROTILE

Table of Contents