7. EAVES STARTER RAIL
7.0
MECHANICALLY DRY FIXING VENTILATED EAVES BAR/STARTER RAILS
Please note that the Eavebar/Starter
Rail ENVEB is an integral part of the
Envirotile Roof System and has been
specifically designed to provide both
the secure patented holding features
for the first course of roof tiles as well
as added ventilation to the underside of
the roof covering which allows for built
up condensation and moisture to escape
through the viaduct channels.
Starting at the right hand gable end verge,
run through the full roof width with eaves
bar/starter rails ENVEB then mechanically
fix with stainless steel screws.
Saddle the felt support tray before fixing
permanently.
Note: Use the pronounced front edge
lip located on the Eaves Starter rail and
saddle the shaped contours of the felt
support tray using the designated screw
apertures to screw fix into the head of the
fascia.
For abutment wall roofs ensure that the
final Starter Rail located next to the wall
provides a gap of 40mm away from the
wall edge.
DO NOT FIT THE LAST STARTER RAIL AT
THIS STAGE - REFER TO ABUTMENT WALL.
1 0
|
E N V I R O T I L E
I N S T A L L A T I O N
DO NOT FIT LAST STARTER RAIL YET
G U I D E
Need help?
Do you have a question about the ENVIROTILE and is the answer not in the manual?
Questions and answers