13. INSTALLING THE RIDGE
13
INSTALLING THE VENTILATED RIDGE ROLL
With all the roof tiles installed and securely fixed, the next step is to fit the ventilated ridge roll (ENV330RIDGEROLL).
VENTILATED RIDGE ROLL -
ENV330RIDGEROLL
Place the ridge roll over the centre of
the bedded batten and lay over the
ridge apex ensuring the roof tiles are
used as a substrate and overlapped by a
minimum distance of 100mm either side
of the apex.
When the ridge roll is correctly
placed into position, remove the tape
protection strip to permanently bond to
the top eaves
course tile surface preventing water
ingress.
Run the ridge roll so that it buts up flush
with the abutment wall ensuring an
overlap at the top edge of the soaker
channel.