19. SINGLE HIP ROOF FACES
19
Working right to left, fit the Envirotiles in the
same way as detailed on pages 20 to 25.
Ensure that the Envirotiles are interlocked
and fix the tiles directly to the plywood
panels.
WORK RIGHT TO LEFT
Follow the same procedures for the
abutment wall side, if required.
Always use double tiles at each end of the
course - this is especially important on
DOUBLE TILE
hipped faces to ensure that the first and last
SINGLE OR DOUBLE TILES
tiles have sufficient fixing points.
DOUBLE TILE
Tiles in the course can be single or double
Always ensure that the first tile and the last
tile are double tiles.
Once the first course is fitted, securely fix
the tiles to the plywood panels.
Using the same procedures detailed for
gable wall roof types on page 24, working
right to left along the roof face, fit 3 tiles at
a time.
3 tiles
Always securely fix each course before
fitting the tiles on the course above.
Continue fitting 3 tiles in stages until the
roof is covered. On the hip ensure that you
always fit a double tile on the hip angle
and trim to fit, leaving a 20-25mm gap for
ventilation and expansion.
At the left hand side ensure that double tiles
are used and trim to fit.
3 tiles
3 tiles
3 3
Need help?
Do you have a question about the ENVIROTILE and is the answer not in the manual?
Questions and answers