Beretta POWER MAX BOX 130-2 P Installation Manual page 39

Modular system
Hide thumbs Also See for POWER MAX BOX 130-2 P:
Table of Contents

Advertisement

To access the terminal jigs operate in this way:
- open the module door (or the left door if two doors are present).
- Unscrew the two screws (1) placed on the panel.
1
- Fold the panel forward by placing it on the two rubber pads. At
this stage, you have full access to the terminal jigs.
MO1
FCV1
MO2
FCV2
Low voltage managing terminal jig MO1
MO1
High-voltage managing terminal jig MO2
MO2
Low voltage terminal jig of the first dependent M1D2
M1D2
High voltage terminal block of the first dependent M2D2
M2D2
Main switch
IG
Cable guide
FCV1
Cable guide
FCV2
IG
M1D2
M2D2
Connect the power cables to the main switch (IG).
FCV1
FCV2
Control signals terminal board
MO1
Output terminal board
MO2
Main switch
IG
Cable guide
FCV1
Cable guide
FCV2
b
Always keep the power cables and signal cables separate.
Route the signal cables to the top of the control panel and se-
cure them to the cable clamp FCV1. Pass the power cables
through the lower part of the panel and secure them with the
cable clamp FCV2.
The cables must exit the machine through the appropriate cable
glands (2) placed on the side panels and at the bottom.
2
IG
39

Advertisement

Table of Contents
loading

Table of Contents