Installation; Kits: 257350 And 257351; Connect Hose To Meter; Install Extension And Nozzle To Meter - Graco LDP5 Instructions Manual

Preset electronic metered dispense valves
Table of Contents

Advertisement

Installation

B
F
. 3
IG
Electronic Control (1) and Gasket (2)
Installation

Kits: 257350 and 257351

It is important to properly seat the gasket (2) when
installing electronic controls (1) to the fluid section
(F
. 4)
IG
An improperly seated gasket could cause the meter to
report invalid dispense amounts because the glass reed
switches are broken.
1
F
. 4
IG
8

Connect Hose to Meter

1. Follow the Pressure Relief Procedure, page 10.
2. Slide the swivel cover (34) onto the hose, small end
3. Apply thread sealant to the male threads of the
4. Thread the hose fitting into the swivel (4) and
NOTE: Make sure to let the sealant cure according to
the manufacturer recommendation before allowing fluid
into the system.
F
IG

Install Extension and Nozzle to Meter

2
1. Thread the sealing nut (26c) into the extension (26a)
2. Thread extension into meter outlet at least three full
first, before connecting the hose fitting to the swivel
(4) (F
. 5).
IG
hose fitting.
tighten firmly (F
. 5).
IG
Hose
Fitting
4
. 5
(F
. 6).
IG
turns to tighten securely (F
NOTICE
Do not over tighten the extension to sealing nut.
Over tightening may cause the meter casting to
split.
Do not use a twist/lock or manual shut off nozzle.
An automatic nozzle must be used on the meter or
the meter could be damaged.
34
. 6).
IG
312668ZAC

Advertisement

Table of Contents
loading

Table of Contents