Network Hardware Installation

This section provides the procedures to install the wireless
network hardware.

Antenna

Determine an installation site for the antenna to allow
maximum wireless network reception. This can be on the
roof the building where the central workstation is located,
or else another appropriate location.
To Install the Antenna:
Install the antenna according to the manufacturer's
instructions.
Run the antenna cable from the antenna to the
location of the ISG-2400 Wireless Gateway router.