Electrical Performance Specifications - Texas Instruments UCD90240EVM-704 User Manual

24-rail sequencer development board
Table of Contents

Advertisement

www.ti.com
3

Electrical Performance Specifications

Table 1. UCD90240EVM-704 Electrical Performance Specifications
Parameter
Input Power
Input voltage range
Input current
Step-Down Converter
Output voltage
Output current
Analog Input
Analog input voltage range
Analog input voltage range
Digital Inputs and Outputs
I/O high-level input voltage
I/O low-level input voltage
I/O input hysteresis
I/O high-level output voltage
I/O low-level output voltage
(1)
Maximum input voltage for PMBUS_CNTRL, PMBALERT#, MARGIN19 and MARGIN20 pins are V33D +0.3 V
SLVUAF3A – March 2015 – Revised March 2015
Submit Documentation Feedback
Test Conditions
All LEDs on, no external load current on I/O pins or step-down
converter
Normal operation, not in margin mode
Use internal reference
Use external reference
(1)
Load current (source) = –4 mA
Load current (sink) = 4 mA
Copyright © 2015, Texas Instruments Incorporated
Electrical Performance Specifications
UCD90240EVM-704 24-Rail Sequencer Development Board
MIN
TYP
MAX
UNIT
4.5
5
5.5
V
135
mA
1.2
V
6
A
0
3.3
V
0
3
V
2.15
5.5
V
0
1.15
V
0.2
V
2.4
V
0.4
V
3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UCD90240EVM-704 and is the answer not in the manual?

Table of Contents