Job No. - Alot (Alo System Test) - Promax RR 14 EVO 2 400 Hybrid Operating & Maintenance Manual

Rail mounted mobile elevating work platform
Table of Contents

Advertisement

PAMP020RR
Revision 2
December 2019
Job No. – ALOT (ALO system test)
Scheduled work
1
Check both ALO lock pins are present
2
Insert one ALO lock pin
3
Check pin engages fully into hole
4
Check ALO lockout area on display is shown
Using slew function, ensure slew is limited to the
5
area shown
Remove first pin and repeat test for second ALO
6
pin
Ensure canopy closes correctly and can be locked
7
down
RR 14 EVO 2 400 Hybrid
Arising work
1
Renew any missing pins
3
Check hole for blockage/debris
3
Check retention chain is not tangled
4
Check pin switch on turret
4
Ensure pin is fully engaged
4
Renew damaged/missing switches
5
Ensure pin is fully engaged
5
Ensure pin is not damaged
5
Ensure pin is type supplied when new
Further investigation is required to determine
5
reason for failure
Do not use machine for ALO working until issue is
5
rectified
5
Repeat Job No. A LOT (ALO system test)
7
Rectify and recheck
Renew damaged/missing ALO canopy lock down
7
bracketry
Revision Record
Page 61 of 73

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pamp020rr

Table of Contents