Staff Competency

In order to comply with the requirements of RIS-1530-PLT, the following minimum level of competence
required is:
For all activities the person leading the task must be able to follow and carry out the instruction detailed in this
document.
All safety critical work must be carried out by persons competent in accordance with:
ORR Railway Safety Publication 1 "Developing and Maintaining Staff Competence" March 2007.
All work relating to the maintenance and overhaul of axle bearings should be carried out by competent
persons.
Staff undertaking this work must have been trained and hold the following certificates of competency:
SCWID (Safety Critical Work Identification).
Apprentice trained Craftsman/NVQ Level 3 in plant maintenance.
Certificate issued by a CITB/CTA approved body – operation for maintenance purposes only.
Re-assessment of competency in accordance with operator's maintenance policy.

Facilities

In order to comply with the requirements of RIS-1530-PLT, all work described in section nine shall be carried
out using facilities (including those of sub contractors) which as a minimum have the following:
Clean, dry, covered accommodation for dealing with wheelsets, bearings, mechanical, hydraulic, electrical
components and systems. Adequate illumination for inspection of components, rail axles and underframes.
Cleaning facilities that will not cause damage to the components.
Handling facilities for removal and refitting of components such as rail axles and engines.
All weather of vulnerable areas of the vehicle and its components.
A suitable length of straight level rail track for carrying out brake tests.
These maintenance activities may be carried out at any location, where the work area is correctly protected,
sufficient clearance is available around the machine and movements will not present risks to other staff and
the machine is correctly secured against movement. Ensure all oil, grease and other fluid containers or
contaminated materials are stored or disposed of as per the relevant procedures. Any specific requirements
over and above those listed will be identified in the applicable job descriptions or section nine.
Auditable records of maintenance to this manual shall be kept in accordance with RIS-1530-PLT Issue 6.

Advertisement

Table of Contents
loading

Related Products for Promax RR 14 EVO 2 400 Hybrid

This manual is also suitable for:

Pamp020rr

Table of Contents