commencing the installation. DO NOT short terminals when working on them.
CAUTION - Avoid resting cables on sharp edges (cold-creep)
The energy manager contains static sensitive components that require careful handling and
proper precautions to be taken. A grounding strap should be worn.
6.1.
Unpacking & Installing in Frame
Upon unpacking, check that the unit is not damaged, and that you have the required number of rectifiers.
The unit flush mounts into a standard 19" mounting frame. The mounting screws should be #12-24;
however, #10-32 may be used with washers. Be sure to mount the unit in the 19" frame squarely if #10-32
screws are used.
Please note the complete system weight is 13.2kg. (29 lbs.). Ensure the 19" mounting rails can withstand
mounting of the system.
A 5/32" (4mm) wide slotted screwdriver has been provided to allow ease of accessing some of the smaller
recessed DIN style terminal block screws.
Note: Do not fit rectifier modules until the Centurion II DC power system has been installed into the rack.
6.2.

AC Cabling

The AC terminals are clearly marked at the rear of the system as shown in Fig 1.0 & 1.1. The terminals can accept
up to 8 AWG/10mm
2
cables.
Once cables are connected, ensure cable clamps are secured. Refer to appendix 5 for AC junction box cover
removal (page 24)
The AC earth terminal earths the System chassis. The AC earth is also internally bonded to the System
chassis by earth stud as shown in Fig 1.1. The AC earth terminal can accept several small cables or up
to a single 2 AWG cable.
DC Common (+ve) is connected to the AC earth as shown in Fig 1.1 but can be removed if output is required
to be isolated.
Note: Refer Appendix 3 for AC Input Transient Protection
CAUTION: For 3 phase operation remove the Single-Phase link fitted
between the phases.
Figure 1 AC Input
AC Junction Box
Newmar • 1580 Sunflower Ave, Suite 100, Costa Mesa, CA 92626
Phone: 714-751-0488 • E-mail: techservice@Newmarpower.com
AC Junction Box w/ Cover Removed
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

C2rs

Table of Contents