Alarm/Ancillary Cabling; Temperature Sensors; Energy Manager Connectivity And The Web Ui - NewMar Centurion II Installation & Operation Manual

-48vdc and +24vdc
Hide thumbs Also See for Centurion II:
Table of Contents

Advertisement

All live DC and Common connections are made to the connectors at the rear of the unit as
shown in Fig 2 and Fig 2.1.
For 1-8 load breakers 8Awg/10mm
10 Awg/6mm
2
terminals as shown in Fig 2 and Fig 2.1.
The battery terminals shown can accept cables up to 2 Awg/35mm
The internal battery cabling goes directly to the circuit breaker, then via a Low Voltage
Disconnect relay and current shunt to the internal live bus. This can be seen on the
wiring diagram at the rear of this manual & in Fig 5.
Ensure cables are strain relieved by utilizing the cable tie slots provided as shown in Fig 2.
6.6.

Alarm/Ancillary Cabling

Alarm and communication cables terminate directly into the terminals of the Energy
Manager. These terminals are accessible by pulling the monitor forward to expose
connections as shown in Fig 3, Fig 3.1, Fig 3.2 & Fig 3.2a. When routing the cables, ensure
they are kept away from the AC and DC power cables when possible.
6.7.

Temperature Sensors

Uncoil the battery temperature sensor tie wrapped to rear of shelf and place in the middle of
the middle battery string. If the lead is not long enough, ordinary 2-core copper (approx. 18
AWG/0.75mm
2
) wire can be used as an extension. The purpose of the battery temperature
sensor is to monitor the ambient temperature of the batteries over long periods of time and
adjust the rectifier output (float) voltage accordingly. As a result, it is not necessary to have
the temperature sensor touching the batteries. If the Battery Temperature Sensor is removed
a "battery temp fault" alarm is generated.
The "Ambient" temperature sensor (optional) can be used to monitor the temperature in
another location if required. Temperature sensors from the older Sm3x controllers are not
compatible with the EM4x controller.
E
M
7.
NERGY
ANAGER
The energy manager is configured via a web browser-based user interface (Web UI).
There are two methods to access the Web UI:
Ethernet connection from the J305 ethernet connector
Front panel micro-USB local connection
7.1.
Access Levels
There are 3 access levels for the Energy Manager Web UI:
enaguest
: can only view status of system
enabasic
: reduced privilege, can view settings and system status
Newmar • 1580 Sunflower Ave, Suite 100, Costa Mesa, CA 92626
Phone: 714-751-0488 • E-mail: techservice@Newmarpower.com
2
terminals are used whereas for 9-16 load breakers,
C
ONNECTIVITY AND THE
.
2
W
UI
EB
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

C2rs

Table of Contents