Appendix 5 - Installation Of Ac Junction Box - NewMar Centurion II Power System Installation & Operation Manual

Dc power system -48 vdc and +24 vdc
Hide thumbs Also See for Centurion II Power System:
Table of Contents

Advertisement

 
 
 
 
A
5 –
PPENDIX
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Cable Tie
 
 
Mount
 
Supplied Cable Clamps 
2 x 3/8" NM Cable Clamp 
1 x 3/4" NM Cable Clamp 
 
 
 
 
 
1. The above illustration shows the rear and side of the AC junction box.
 
2. To remove the junction box cover, loosen the four screws located at the top of the AC junction box.
 
3. Loosen cable clamp screws and route AC cables though cable clamps. Connect AC
cables to AC input terminal block. (See Centurion II Input wiring options (M-C2ACOPT)
drawings for wiring options)
 
4. Tighten cable clamp screws and confirm the cables are firmly secured.
 
5. Re-install top cover and tighten screws.
 
INSTALLATION OF AC Junction Box
 
 
 
 
Newmar • PO Box 1306, Newport Beach, CA 92663
• Phone: 714-751-0488 • E-mail: techservice@newmarpower.com
Loosen Screws to Remove Cover x 4 
AC Junction Box
(Right Rear)
24
 
 
 
 
Centurion II
Rectifier Shelf

Advertisement

Table of Contents
loading

This manual is also suitable for:

C2rs

Table of Contents