Installing The Electrical Connection; Fusing Requirements - Dexter Laundry T-1800 Operators Manual Installation & Operation Instructions

Commercial washers vended c-series control
Table of Contents

Advertisement

2.11.1 INSTALLING THE ELECTRICAL CONNECTION

2.11.1.1
Disconnect all power to the washer.
2.11.1.2
Remove the top panel of the washer and locate the power terminal block
near the back of the control compartment.
2.11.1.3
If power is 120V-1PH-60Hz, connect L1, N and Ground.
2.11.1.4
If power is 208-240V-3PH-60Hz, connect L1, L2, L3 and Ground. If there
is a high leg, it must NOT be connected to L1 or L2. However, failure due
to a voltage surge on the high leg is not covered by equipment warranty.
Contact Dexter Laundry with any questions.
2.11.1.5
If power is 208-240V-1PH-60Hz, connect L1, L2 and Ground.
2.11.1.6
If power is 230V-1PH-50Hz, connect L1, N and Earth.
NOTE: It is important that the grounding screw next to the power
terminal block be connected to a good external ground.

2.11.2 FUSING REQUIREMENTS

Single- and Three -phase models:
See specification sheet for required TIME-DELAY (DUAL ELEMENT)
FUSE size (or equivalent circuit breaker)
8514-296-001 REV K page 49

Advertisement

Table of Contents
loading

Table of Contents