Husqvarna FC 250 2016 Repair Manual page 33

Hide thumbs Also See for FC 250 2016:
Table of Contents

Advertisement

201715-10
e
I
I
Lubricant (T14034)
Info
I
Sealing lip downward, open side upward.
-
Push on support ring
-
Remove the special tool.
-
Sand the edges of the sliding bushings with 600 grit sandpa-
per; then clean and grease the bushings.
I
Fork oil (SAE 4) (48601166S1)
-
Push on lower sliding bushing
-
Mount upper sliding bushing (D.
Info
I
Without using a tool, pull the stack slightly apart by
hand.
-
Warm up the outer tube in area
ing.
/
I
Guideline
so
c
(122 °F)
0
-
Slide the outer tube onto the inner tube.
-
Hold the lower sliding bushing with the longer side of the
special tool.
I
Mounting tool (T14040S)
-
Press the sliding bushing all the way into the outer tube.
-
Position the support ring.
-
Hold the seal ring with the shorter side of the special tool.
I
Mounting tool (T14040S)
-
Press the seal ring and support ring all the way into the outer
tube.
6 FORK, TRIPLE CLAMP
(�
p. 282)
C,.
(�
p. 280)
0.
f)
of the lower sliding bush-
(�
p. 298)
(�
p. 298)
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

F2101

Table of Contents