Run-Up The Header - MacDon A30-S Assembly Instructions Manual

Auger self-propelled windrower header
Table of Contents

Advertisement

I. RUN-UP THE HEADER
CAUTION
Never start or move the machine until you
are sure all bystanders have cleared the
area.
CAUTION
Clear the area of other persons, pets etc.
Keep children away from machinery. Walk
around the machine to be sure no one is
under, on or close to it.
CAUTION
Before investigating an unusual sound or
attempting to correct a problem, shut off
engine, engage parking brake and remove
key.
Refer to your M Series Unloading and Assembly
Instructions, or your M Series Self-Propelled
Windrower Operator's Manual.
a. Operate the machine slowly for 5 minutes,
watching
and
WINDROWER SEAT for binding or interfering
parts.
b. Run the machine for 15 minutes at maximum
engine operating rpm and perform the run-up
check as listed on the "Pre-Delivery Checklist"
(yellow sheet attached to this instruction) to
ensure the machine is field-ready.
c. Check actual speed of wobble box pulley using
a hand-held optical tachometer during run-up.
Speed
should
be
and 950 rpm for A30-D and A40-D with the
engine at 2600 rpm (M100), 2300 rpm (M150,
M200, M205).
Form 169078
PRE-DELIVERY CHECKS
listening
FROM
775
rpm
for
A30-S,
d. If speed is incorrect, check the header ID in the
windrower display module, or the header drive
pump may require adjusting.
THE
51
Revision C

Advertisement

Table of Contents
loading

This manual is also suitable for:

A30-dA40-d

Table of Contents