Laguna Tools Smartshop Composite Fabricator 16 Manual page 8

Table of Contents

Advertisement

Machine Set-Up (Cont'd.):
7.) Prepare adequate supply of materials for practice cutting as well as several 3⁄4" MDF sheets for use as spoil boards (Material
to be cut and tested on).
8.) Has the person to be trained to work on the machine(s) by our technician read all the instruction manuals prior to set-
up/training?
9.) Make sure the Associates has been trained in the software prior to set-up/training.
Should a technician representing Laguna Tools not be able to come to the site and work on the machines due to the lack of
preparedness or inoperable equipment per the above and/or beyond Laguna Tools control any expenses incurred will be passed
on to you. The customer will cover all expenses incurred during set up and training on the proper use of the machine(s) including
but not limited to: Airfare, Rental Car, Hotel, Parking and/or Toll Fees per Diem, plus $115.50 per hour.
The above points have been read and understood, and the customer will be responsible for any delay and agrees to reimburse
Laguna Tools for any additional expenses incurred.
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Suv ii

Table of Contents