Laguna Tools Smartshop Composite Fabricator 16 Manual page 14

Table of Contents

Advertisement

Machine Set-Up:
CNC Machine (SUV II) CF 16: Machine Set-Up
IMPORTANT: In order for installation to be efficient and cost effective we require several items to be completed PRIOR to our Technician's arrival.
Should you have any questions please feel free to call our Customer Service at 1-800-234-1976 or contact your Sales Representative.
Following are the steps you have to perform in order for us to schedule the set-up/training-
1.) Remove all protective coating and packaging.
2.) Check if machine has all the tooling (Tools, Bits, Kits, etc.) components that were placed in your order.
3.) Make sure your building/shop have appropriate electrical voltage and amperage per machine(s).
*Electricians and service staff are welcome to contact our Customer Service if they have any questions.
4.) Make sure the main power & vacuum pumps can be connected to the cabinet.
5.) Make sure the machine(s) are leveled with the leveling feet installed.
6.) Clean dry air is vital for the machine(s) performance. Make sure the clean dry compressed air is attached to the machine(s).
14

Advertisement

Table of Contents
loading

This manual is also suitable for:

Suv ii

Table of Contents