1.6. Target Group
This operating manual has been prepared for qualified technical personel.
1.7. Security Notes
Following notes should be taken into consideration in order to avoid dangers which can occur on the operator and around the ambient.
Installation, operation and maintenance of this instrument should be made only by people who have read the operating
manual and who are knowledgeable about work safety!
It should be complied with work safety, accident prevention regulations and national installation standards.
Escaping steam or hot water when working on boilers.Wait for the pressure gets down to zero to intervene the device
Electrical shock while working with terminal strip which has 220-240 VAC on all terminals possibly.always cut off the power before interventions.
Product should be used only within the scope of stated specifications!
You can assemble the instrument only when pressure is not available!
1.8. Content of Package
Please check whether you have taken delivery of below listed content completely or not and check its conformity with criterions in your order:
·Level Switch
·This operating manual
2. Installation
2.1. General Notes
Installation of the instrument should be made only by authorized personnel.
Do not apply force to the instrument during the installation!
Do not use the level switch with a greater pressure than recommended pressure.
Do not forget that instrument is precise, carry it carefully and prevent to be damaged.
It should be guaranteed that there are not any magnetic particles.
2.2. General Installation Stages
·Remove level indicator from the box carefully
·Check whether gasket is appropriate for fluid or not. If is not appropriate, contact with the producer.
·Then, apply below mentioned explanations according to structure of the design.
·Level switch should be placed in completely vertical position on the line.
·If instrument is mounted outside and if there is any danger of lightning or excessive pressure, take preventive measures
·In the operating conditions, level switch may be hot according to situation of fluid, in this case, do not touch the indicator, otherwise your skin is damaged.
2.3. Installation For Mechanical Connections
·Use appropriate O-Ring or gasket for tightness.
·Ensure that its surface is clean and smooth.
·Assemble the instrument manually.
(For G1" max. 20 Nm , For G2" max. 30 Nm)
ISS
04
3
by taking necessary measures.
Need help?
Do you have a question about the ISS 04 and is the answer not in the manual?