Step 4. Install Gauge Rollers - MacDon A30-S Assembly Instructions Manual

Auger self-propelled windrower header
Table of Contents

Advertisement

STEP 4. INSTALL GAUGE
ROLLERS
If kit not supplied proceed to STEP 5. LOWER
HEADER, otherwise install kit as follows:
This kit may be installed later in the
header assembly sequence but it may be
easier prior to laying the header down.
a. Unpack gauge roller bundle.
b. Remove two clevis pins (A) from each assembly.
c. Remove
nuts,
bolts,
assembly.
d. Insert tabs on roller assembly into slots (C) on
cutterbar at outboard mounting locations on
frame and secure with two clevis pins (A) at
lowest position.
Form # 169078
UNLOADING AND ASSEMBLY
NOTE
B
A
and
clips
(B)
C
A
e. Attach clips (B) with bolts and nuts removed at
step c. to secure roller assembly to cutterbar.
Use a socket and ratchet wrench to
access the nuts.
f.
Remove clevis pins (A) and adjust rollers to
desired height. Re-install two clevis pins (A) and
secure with lynch pins.
g. Repeat above steps for opposite side. Set both
gauge rollers to same position.
from
9
B
A
NOTE
Model Year - 2009

Advertisement

Table of Contents
loading

This manual is also suitable for:

A30-dA40-d

Table of Contents