Optical Cable Connection
When using an optical cable to establish the connection between the Main PIM and Remote PIM,
connect each end of the cable to the CN1 connector of the M10 cards on both sites. Two DAI
cards are connected to one M10 card, via MDF through LTC connector on the BWB or CN con-
nector on the DAI card.
Figure 2-25
through
MDF cross connection.
Figure 2-25 Outline of Optical Cable Connection
MAIN PIM
MDF
DAIA/
DAIC/
DAID/
DAIF
DAIA/
DAIC/
DAID/
DAIF
2
NEAX2000 IVS
Remote PIM System Manual
ND-70917 (E), Issue 1.0
Figure 2-27
show an outline of the connection and an example of the M10
M10
CN1
Max. 10 km (6.25 miles)
Connection Between Main Site and Remote Site
OPTICAL
CABLE
M10
CN1
CHAPTER 2 INSTALLATION
REMOTE PIM
MDF
DAIB/
DAIC/
DAIE/
DAIF
DAIB/
DAIC/
DAIE/
DAIF