Connection Between Main Site And Remote Site; Dai Connection At Main Site; Figure 2-21 Dai Cable Connection Via Ltc Connector (Main Site) - NEC NEAX2000 IVS2 Manual

Integrated voice server, remote pim system
Hide thumbs Also See for NEAX2000 IVS2:
Table of Contents

Advertisement

CONNECTION BETWEEN MAIN SITE
AND REMOTE SITE

DAI Connection at Main Site

(1) When using the LTC connector on the BWB
Connect the cable to a CSU or directly to the Remote PIM via the MDF as shown in
2-21.
Figure 2-22
For the optical cable connection between the Main PIM and the Remote PIM, refer to
"Optical Cable Connection" on Page

Figure 2-21 DAI Cable Connection via LTC Connector (Main Site)

MAIN PIM
BWB
DAIA/
DAIC/
DAID/
DAIF
LTC0/1/2/3 CONNECTOR
NOTE 1: When the Remote PIM is directly connected without CSU, maximum distance is
400 m (1312 ft.) between the Main PIM and the Remote PIM.
NOTE 2: When the DAIA/DAID card is mounted in the AP11 slot, be sure to use the CN
connector on the DAIA/DAID card. See (2) on
2
NEAX2000 IVS
Remote PIM System Manual
ND-70917 (E), Issue 1.0
shows an example of DAI MDF cross connection.
51.
TWISTED-PAIR
CABLE
(SHIELD TYPE)
Max. 200 m (656 ft.)
φ
(0.65
cable)

Connection Between Main Site and Remote Site

MDF
NOTE 1
Page
CHAPTER 2 INSTALLATION
CSU
REMOTE PIM
CSU: CONNECTION
SERVICE UNIT
49.
Figure
Page 47

Advertisement

Table of Contents
loading

Table of Contents