5 Mechanical Installation
N N o o
C
D
E
Construct foundation according to the scheme shown in figure below.
F F i i g g u u r r e e
5.3.4 Other Precautions
After fixing, the inverter should be fully welded with the pre-embedded channel steel.
A drainage system should be designed on the installation site to prevent the
inverter from being immersed in water during heavy rainfalls.
Do not plant any trees near the installation site to prevent the inverter from
being damaged by tree leaves or stems.
28
N N a a m m e e
Strip foundation
Ground
Protective grid
N N a a m m e e
20# steel channel
Inverter base
Step
Operation platform