5.4 -
PACKAGING REMOVAL
Packaging removal
Operator qualification •
PPE required
To unpack the equipment in a cardboard box, proceed as follows:
Step
Action
1
Remove the straps (A).
2
Remove the packaging cardboard (B).
Remove the fasteners that secure the equipment to the base (if
3
any).
Move the equipment from the base to the place intended for it.
NOTE!
4
Have at least 2 operators manually move the packages if
required due to their dimensions/weight.
NOTE!
After removing all packaging materials, check for any anomalies.
If there are anomalies:
•
do not install the equipment;
•
contact PIETRO FIORENTINI S.p.A. and specify the details provided on the equipment nameplate.
5.4.1 - PACKAGING DISPOSAL
NOTE!
Sort the various materials making up the packaging and dispose of them in compliance with the regula-
tions in force in the country of installation.
47
Installer.
WARNING!
The PPE listed in this table is related to the risk associated with the equipment.
For the PPE necessary to protect against risks associated with the workplace or
operating conditions, please refer to:
•
the regulations in force in the country of installation;
•
any information provided by the Safety Manager at the installation facility.
LOW-PRESSURE GAS REGULATOR
Image
B
A
A
|
TRANSPORT AND HANDLING
Use, maintenance and warning manual
Tab. 5.27.
A
Tab. 5.28.
|
REV. 00
EN