Flue Assembly Installation; General Coil Piping And Connection; Recommendations - Trane IntelliPak 1 Installation, Operation And Maintenance Manual

Commercial packaged rooftop air conditioners with vav or szvav controls and eflex/ edrive
Table of Contents

Advertisement

Figure 23. Ultra modulating gas train for 500 to 850
MBh
Ratio Regulator
Main Gas
Solenoid
Valves
Pilot Pressure
Regulator
Main Gas
Regulator
To Combustion
Air Sensor
Figure 24. Ultra modulating 1000 MBh
Manual
shut-off
valve
Burner
gas
manifold
Connection
into burner
box
Pilot
Pilot
pressure
solenoid
regulator
valve
1 1/4"
field elbow
connection
Manual
shut-off
valve

Flue Assembly Installation

1. Locate the flue assembly and the extension (refer to
Figure 25, p. 45
for extension usage) in the ship
with section of the unit.
2. Install the flue extension onto the flue assembly as
shown in
Figure 25, p.
3. Slide the pipe clamp onto the heater flue tube
located inside the heater compartment.
4. Insert the tube on the flue assembly into the hole
located in the vertical support for the heat section.
5. Butt both tube sections together and center the pipe
clamp over joint.
6. Using the pre-punch holes in the flue assembly,
extension, and the vertical support, install the
appropriate number of mounting brackets (Refer to
RT-SVX072A-EN
Burner
Manual
Gas Manifold
Shut-off
Valve
Pilot Solenoid
Valve
Manual Shut-off
Valve
1" Field
Elbow Connection
Ratio
regulator
To combustion
air sensor
Main gas
regulator
45.
the installation instructions that ship with the flue
assembly.)
Figure 25. Flue assembly
Flue Extension
(20-25 Ton N/A)
(30 Ton 13" Long)
(40, 60, 70, 75 Ton 25" Long)
(50-55 Ton 37" Long)
(90-130 Ton 37" Long)
Connections
into Burner
Box
Vent Cap
Assembly
Heat Section
Vertical Support
General Coil Piping and
Connection Recommendations
Proper installation, piping, and trapping is necessary to
ensure satisfactory coil operation and to prevent
operational damage:
Main gas
solenoid
valves
N N o o t t e e : : The contractor is responsible for supplying the
installation hardware.
☐ Support all piping independently of the coils.
☐ Provide swing joints or flexible fittings on all
connections that are adjacent to heating coils to
absorb thermal expansion and contraction strains.
☐ Install factory supplied control valves (valves ship
separately).
C C o o n n n n e e c c t t i i o o n n L L e e a a k k s s ! !
F F a a i i l l u u r r e e t t o o f f o o l l l l o o w w i i n n s s t t r r u u c c t t i i o o n n s s b b e e l l o o w w c c o o u u l l d d
r r e e s s u u l l t t i i n n d d a a m m a a g g e e t t o o t t h h e e c c o o i i l l h h e e a a d d e e r r a a n n d d c c a a u u s s e e
c c o o n n n n e e c c t t i i o o n n l l e e a a k k s s . .
U U s s e e a a b b a a c c k k u u p p w w r r e e n n c c h h w w h h e e n n a a t t t t a a c c h h i i n n g g p p i i p p i i n n g g t t o o
c c o o i i l l s s w w i i t t h h c c o o p p p p e e r r h h e e a a d d e e r r s s . . D D o o n n o o t t u u s s e e b b r r a a s s s s
c c o o n n n n e e c c t t o o r r s s b b e e c c a a u u s s e e t t h h e e y y d d i i s s t t o o r r t t e e a a s s i i l l y y . .
☐ When attaching the piping to the coil header, make
the connection only tight enough to prevent leaks.
Maximum recommended torque is 200 foot-
pounds.
I I n n s s t t a a l l l l a a t t i i o o n n
Mounting Brackets
(20-25 Ton (1))
(30 Ton (2))
(40-130 Ton (4))
Pipe Clamp
Flue Tube
N N O O T T I I C C E E
45

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Symbio 800

Table of Contents