Installing Rru Cables - Huawei RRU5303 Installation Manual

Table of Contents

Advertisement

RRU5303
Installation Guide
About This Chapter
This chapter describes the procedure for installing RRU cables.
8.1 Cabling Requirements
Cables must be laid out according to the specified cabling requirements to prevent signal
interference.
8.2 RRU Cable Connections
This section describes RRU cable connections.

8.3 Installing RRU Cables

This chapter describes the procedure for installing RRU cables.
8.4 RRU Cable List
This section describes RRU cable connections.
8.5 Installing an RRU PGND Cable
This section describes the procedure for installing an RRU PGND cable.
8.6 Installing an RRU RF Jumper
This section describes the procedure for installing an RRU RF jumper.
8.7 Installing an RRU AISG Multi-Wire Cable and AISG Extension Cable
This section describes the procedures for installing an RRU AISG multi-wire cable and AISG
extension cable.
8.8 Opening the Cover Plate of an RRU Cabling Cavity
This section describes the procedure for opening the cover plate of an RRU cabling cavity.
8.9 Installing a CPRI Optical Fiber
This section describes the procedure for installing a CPRI optical fiber.
8.10 Installing an RRU power cable
This section describes the procedure for installing an RRU power cable.
Issue Draft B (2018-05-15)
8
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Installing RRU Cables
8 Installing RRU Cables
86

Advertisement

Table of Contents
loading

Table of Contents