Huawei RRU5303 Installation Manual page 77

Table of Contents

Advertisement

RRU5303
Installation Guide
Figure 7-31 Installing the RRU mounting kits
Ensure that the arrows on the pole mounting kits are pointing up.
1.
2.
Step 3 Use a 16 mm (0.63 in.) M10 torque wrench to tighten the nuts to 40 N· m so that the mounting
kits are secured onto the angle steel, as shown in Figure 7-32.
Tighten the nuts on the two square-neck bolts simultaneously. After the main and auxiliary
brackets are secured properly, measure the spacing between the mounting kits on both sides
and ensure that the spacing is the same on the two sides.
Issue Draft B (2018-05-15)
Adjust the position of the nut and remove the square-neck bolt at the open end from the
slot on the auxiliary bracket.
Slide the mounting brackets onto the angle steel horizontally and insert the square-neck
bolt into the slot.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 Installing the RRU
69

Advertisement

Table of Contents
loading

Table of Contents