Rru Cable List - Huawei RRU5303 Installation Manual

Table of Contents

Advertisement

RRU5303
Installation Guide
Figure 8-13 Procedure for installing RRU cables

8.4 RRU Cable List

This section describes RRU cable connections.
Table 8-1 lists RRU cables.
Table 8-1 RRU cables
Cable
RRU PGND
Cable
RRU Power
Cable
CPRI Fiber
Issue Draft B (2018-05-15)
One End
Connector
OT terminal
2
(M6, 16 mm
or
2
0.025 in.
)
Female
connector
(pressfit type)
DLC connector
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
The Other End
Installation
Connector
Position
Ground
OT terminal
terminal on
(M8, 16 mm
the RRU
0.025 in.
NEG(-) and
Depending on
RTN(+) ports
the power
on the RRU
supply
equipment
CPRI0 port on
DLC connector
8 Installing RRU Cables
Installation
Position
Ground terminal
2
or
on the ground
2
)
bar
External power
equipment
CPRI port on a
98

Advertisement

Table of Contents
loading

Table of Contents