Figure 7-37 Marking anchor points
(1) Level
As shown in the figure above, it is recommended that the pole installation bracket be installed at a
position 1200 mm (47.24 in.) to 1600 mm (59.06 in.) high above the ground. If the space is insufficient,
only the 3.5 Installation Clearance Requirements of an RRU needs to be provided.
Step 3 Drill holes at the anchor points, and then insert expansion anchor bolts, as shown in Figure
7-38.
Figure 7-38 Drilling holes and inserting expansion anchor bolts
(1) M10× 80 bolt
Issue Draft B (2018-05-15)
(2) Pole installation bracket
(2) Nut
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
(3) Spring
(4) Flat washer
washer
7 Installing the RRU
(3) RRU
(5) Expansion
sleeve