CLEARPOINT
®
3eco
coalescing filter
8.2 Commissioning work
The following requirements must be fulfilled to carry out commissioning work and preparatory work must be completed.
Tool
•
none
1.
Completed installation with leak test
Automatic drainage
34 | 60
Preconditions
Material
•
none
Preparatory work
Picture
Mechanically open
Installation and operation instructions
Protective equipment
•
none
Description
1. Turn knurled screw on the float drain from
"Mechanically open" counterclockwise
(left-hand thread) to "Automatic
drainage".