Revo E Sizing - CD Automation REVO E 3PH User Manual

Thyristor unit from 25a to 600a
Table of Contents

Advertisement

CD Automation srl

4 REVO E Sizing

4.1.1 Star wiring with resistive load
P
I
1,
73
V
V = Nominal voltage phase to phase
I = Nominal current of the load
P = Nominal power of the load
4.1.2 Star wiring with inductive load
P
I
1
, V
73
cos
V = Nominal voltage phase to phase
I = Nominal current of the load
P = Nominal power of the load
4.1.3 Delta wiring with resistive load
P
I
1,
73
V
V = Nominal voltage phase to phase
I = Nominal current of the load
P = Nominal power of the load
4.1.4 Delta wiring with inductive load
P
I
1
, V
73
cos
V = Nominal voltage phase to phase
I = Nominal current of the load
P = Nominal power of the load
4.1.5 Open Delta wiring with resistive load
P
I
3
V
V = Nominal voltage phase to phase
I = Nominal current of the load
P = Nominal power of the load
REVO E-3PH from 25A to 500A
11
User's Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the REVO E 3PH and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Revo e-3ph basic

Table of Contents