CONTROL PANEL GUIDE
LED
indicator
Temperature
control
knob
OPERATING GUIDELINES
REMINDERS:
·
Make sure the equipment is placed on a flat stable surface and all
the heatgenerating components placed on their respective hold
ers or stands.
·
Ensure all function switches are OFF prior plugging to wall outlet.
·
Ensure all terminal connections are properly secured.
A. INITIAL PROCEDURES
1. Insert the power cord into the receptacle at the back
of the station.
2. Plug the power cord into a grounded wall socket. The
station is protected against electrostatic discharge and
must be grounded for full efficiency.
6
ON/OFF
Switch
AC in
PLUG