Komatsu 114E-3 Series Shop Manual page 340

Table of Contents

Advertisement

SEN00464-01
46. Removal from engine repair stand
1)
Sling engine assembly (1) temporarily and
disconnect it from repair stand A.
4
Engine assembly: Approx. 800 kg
(Weight depends on each applica-
ble machine)
2)
Remove tool B.
3)
Place and fix engine assembly (1) on sta-
ble engine stand [1].
4)
Install plates (3) and (5).
5)
Install ground wire (4) of the main control-
ler to plate (3).
32
50 Disassembly and assembly
47. Muffler
1)
Install plate (1).
2)
Install plate (2) and block (3).
3)
Install tube (4).
3
Clamp:
6.9 – 8.8 Nm {0.7 – 0.9 kgm}
4)
Install muffler assembly (5).
48. Refilling with oil
1)
Check that the engine oil drain plug is
tightened.
2)
Add oil through the oil filler to the specified
level.
5
Engine oil pan: Approx. 24
l
114E-3 Series

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Saa6d114e-3

Table of Contents