Setting Up The System; Unpacking The System; Repacking For Shipment - Sun Microsystems SPARCserver 1000 System Installation Manual

Hide thumbs Also See for SPARCserver 1000 System:
Table of Contents

Advertisement

2

Setting Up the System

This chapter contains procedures for unpacking, connecting the power cord,
and cabling the SPARCserver 1000 system.

2.1 Unpacking the System

Since you are reading this manual you have already opened the
SPARCserver 1000 system shipping container and the box containing the
manual set. Remove the key and power cord from their packing box and set
them aside. These items are needed to power on the system. Follow graphic
instructions on the shipping container to remove the server from the container.
Warning – Two people are required to lift the server because it weighs more
!
than 70 lbs (32 kg) and personal injury could result.

2.1.1 Repacking for Shipment

Use the original shipping containers and packing materials to store or, if
necessary to ship your server. Follow in reverse order the graphic unpacking
instructions printed on the shipping container.
2-1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SPARCserver 1000 System and is the answer not in the manual?

Questions and answers

Table of Contents