enphase ENV-S-WM-230 Installation And Operation Manual page 36

Iq gateway-m
Hide thumbs Also See for ENV-S-WM-230:
Table of Contents

Advertisement

5. Unlatch the split-core of the production CT (if used) before disconnecting. Once the CT is
unlatched, remove it from the sensed wires.
6. Unlatch the split-core of the consumption CT (if used) before disconnecting. Once the CT is
unlatched, remove it from the sensed wires.
7. When the replacement IQ Gateway arrives, install the IQ Gateway and provide power as
described in "2. Provide a Power Connection" on page 13.
8. Install the new production CT and consumption CT (if used) as described in "3. Install CTs
for Metering (Model ENV-S-WM-230 or ENV-S-AM1-230-60)" on page 15.
9. Verify that the new IQ Gateway powers up.
BEST PRACTICE: When powered up and connected for the first time, the IQ Gateway-
May retrieve an automatic upgrade from Enphase. This upgrade may take up to 15
minutes. During upgrade the IQ Gateway LEDs flash green sequentially.
WARNING! Risk of Equipment Damage. Do not remove power from the IQ Gateway if
the IQ Gateway LEDs are flashing green sequentially. This indicates that a software
upgrade is in progress.
10. Connect the IQ Gateway to Enlighten as described in "8. Connect to Enlighten" on page 19.
11. Verify that the new IQ Gateway Network Communications LED
five minutes. If not, follow the network troubleshooting steps on page 36.
12. If possible, log in to Enlighten and add the IQ Gateway to the Activation for this system
by clicking "Add Another Envoy" under the "Envoy" section.
13. Verify that the new IQ Gateway starts discovering microinverters within 20 minutes of
starting up. If necessary, use the Enlighten or Device Scan button to start a new device
scan during daylight hours. (See "Initiate a New Scan for Microinverters" on page 24.)
NOTE: If the old IQ Gateway has communicated to the microinverters on the same day
that the new replacement IQ Gateway is installed, the new IQ Gateway will be unable to
discover the microinverters. Contact Enphase at
assistance in this situation.
14. Assess the power line communications by running a Communication Check from Enlighten
or the Installer Toolkit. If the communication check shows poor power line communications,
relocate the IQ Gateway closer to the Switchboard.
15. Contact Enphase Support at enphase.com/global/support-request to have the new IQ
Gateway added to your system and to retire the replaced IQ Gateway.
Alternatively, you can use the Enphase Installer App. Open the app, select your system,
go to the Support tab, tap Replace Envoy, enter the details, and Submit.
16. Ship the old IQ Gateway to Enphase using the supplied RMA shipping label.
36
© 2022 Enphase Energy Inc. All rights reserved.
IQ Gateway-M Installation and
Operation
lights green within
http://www.enphase.com/philippines
for
141-00031 Rev 02

Advertisement

Table of Contents
loading

This manual is also suitable for:

Env-s-am1-230-60

Table of Contents