Installation Sequence
10
1. Choose a location
for the IQ Gateway
2. Provide a power
connection
3. Install CTs, if needed
4. Optional: Install and configure DNO
interface
5. Energise the IQ Gateway
6. Detect microinverters
7. Verify system configuration
8. Connect to Enlighten
9. Send summary report
© 2022 Enphase Energy Inc. All rights reserved.
IQ Gateway-M Installation and
Operation
141-00031 Rev 02