Commissioning; Establish Power Supply - Schick Q3 Series Instructions Manual

Hide thumbs Also See for Q3 Series:
Table of Contents

Advertisement

6.2 Commissioning

Establish power supply

Signal cable for
suction
(optional)
 Connect the motor handpiece to the "Handpiece" socket.
 Optional: Connect the operating unit to the control unit with the cable.
 Optional: Connect a foot pedal to the "Footpedal" socket (table-top device
only)
 Optional: Plug the "Power stick" into a free socket (control satellite or foot pe-
dal)
 Optional: Connect a suction point signal cable or signal transmitter to the "Sig-
nal cable for suction" socket (for use of the interface, see page 13, 4.3)
 Insert the AC adapter plug into the power socket of the control unit.
Only when the handpiece and control satellite (optional) have been correctly
connected to the control unit, plug the power cord into the socket (100 - 240
volts)
Issue Q3
100 - 240 volts
Handpiece
Foot pedal
(optional)
Control satellite (optional)
Installation and commissioning 6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Q3 basicQ3 profiQ3 premium107851077510765

Table of Contents