INSTALLATION INSTRUCTIONS
LEVEL BASE
Place level on the top of the table and check the
unit for level side to side. Adjust the leveling feet as
necessary until the machine is level. See FIG. 6
Place a level across the table from front to rear. Adjust
the leveling feet as necessary until the machine is level.
See FIG. 5.
After machine has been leveled front to back and side
to side, thread the hex jam nuts up against the fixed
nut. Be careful not to move the leveling feet during this
process. See FIG. 4. Ensure that all four leveling feet
are firmly contacting the floor.
Recheck with level after locking nuts are firmly
tightened.
THE EQUIPMENT SHOULD NEVER BE LEFT UNATTENDED WHEN RUNNING.
It is recommended that this machine is installed in a separate area of the facility,
such as a dedicated grinding room where access to the equipment can be
restricted and proper ventilation can be provided.
A forklift or pallet jack can be used to move or
position this equipment. The forklift must have forks
that are a minimum of 48" [122cm] long.
When using a forklift lift in the center of the machine
and be sure the forks extend all the way from the
front to the back of the machine.
Once the machine is removed from the pallet, it
can be moved using a pallet jack by cutting the pre-
marked boards (2" x 6" x 43.5") from the shipping
FIG. 3
pallet and placing them into the slots shown in FIG 3.
FIG. 5
13
ORIGINAL INSTRUCTIONS
LIFTING LOCATION
LOOSEN JAM NUT TO
ADJUST FOOT
LEVELING FEET LOCATED
AT CORNERS OF MACHINE
FIG. 4
FIG. 6