APPENDIX C: MAINTENANCE

APPENDIX C3: MAINTENANCE CHECKLIST

Maintenance Check List
Unit Type: ______________________
Description
Electrical
Water
Date of Maintenance: ___________________
Component
Check For
Incoming electrical
Visually inspect incoming electrical supply
supply
and isolation for signs of damage. If any major
upgrades have been installed to the site confirm
that there is sufficient power for unit operation.
Electrical wiring
Check wiring in control box. Replacing any
damaged or loose wires.
Isolator fitted and
Check isolator switch for signs of damage.
operating
Confirm that switch isolates unit.
Single or 3 phase
Test and record incoming voltage to unit.
power test
Fan Motor
Refer to manufactures specifications
Belts and pulleys
Check belts and pulleys for signs of wear and
visual inspection
damage. Check for rubber deposits and if belts
have a glazed or slick look. Replace if required
Belts and pulleys
Check alignment of pulleys. Check tension of
thorough inspection
belts. Replace if required
Fan obstructions and
Check fan is clear of any foreign objects. Confirm
direction
fan is operating in correct direction
Fan Bearings
Check greasing of fan bearings and grease as
necessary.
Incoming Water
Visually inspect incoming water connection for
Supply
signs of damage. Check that the unit isolation
valve is in good working condition and easily
accessible. If any new water appliances have
been installed confirm that there is sufficient water
pressure and flow for unit operation.
Water connections
Visually inspect the water piping to and within the
visual inspection
unit.
Water isolation fitted
Check water isolation valve successfully isolates
and in good condition
the unit.
Water Supply
Check incoming supply pressure against unit label
Pressure
Drain Unit
Confirm that drain or auto-drain can remove water
from the unit
Clean out the unit
All foreign material is cleaned out of the unit.
Internal surfaces wiped down.
Cooling pads.
Wash the cooling pads with a garden hose spray
nozzle. Check for build up of dirt and/or salt.
Replace if required.
Float Valve Operation Check that the float valve allows water to flow until
the water reaches 5mm below the overflow.
Bleed Valve
Check that the bleed valve rate per Note:-
Operation
Formation of salt deposit in cooler pads indicates
insufficient bleed off.
Pump Operation
Check that the pump operates when the cooling
function is active.
Water Distribution Tap
Check that the water distribution tap is set to allow
Settings
the required flow rate to the pads.
C=Clean
R= Replace
A= Adjust
= Check
N/A= Not Required